Energoprojekt Industrija a.d.
PHARMACEUTICAL INDUSTRY

NUMBER OF SELECTED REFERENCES: 17

Page 3 od 4        Back   2    3    4    Next
PROJECT:
Provision of consultancy services and monitoring services at building of plant for the production of oral polio vaccinations within Institute for immunology and virusology “Torlak“, 100 mil dose/y., 1800 m2.
INVESTOR:
Institute for imunology and virusology “TORLAK“, Belgrade
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for pharmaceutical plant within the complex “Zdravlje“ Leskovac, surface of 7050 m2.
INVESTOR:
“ZDRAVLJE“, Leskovac
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building: Factories of final medicines 12.500 m2 Factories of peniciline antibiotics in Dubovac: injections 30 mil/y.;ampules 60mil/y. tablets 20mil/y.; syrup 5 mil/y. Factories of cephalosporine antibiotics: injections 30 mil/g. Medicine plant in ampules for liophilization 5.670 m2 Infusion solutions plant 4.000 m2 High rack storage 12.800 palettes within the complex “Hemofarm“ in Vršac.
INVESTOR:
“HEMOFARM”, Vršac
COUNTRY:
Serbia
PROJECT:
Implementation of works at extension, sanitation and refurbishment of the Central storage-business facility “VELEFARM“, Belgrade, 2.500 m2 extension to business facility 1.600 m2 sanitation of roof cover 6.500 m2 refurbishment of road surfaces and ground installations.
INVESTOR:
“VELEFARM“ Belgrade
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building factory of solid pharmaceutical products of the company “Ivančić i sinovi“ in Stari Banovci, 2.760 m2.
INVESTOR:
“DREN FARMA”, Belgrade
COUNTRY:
Serbia
Page 3 od 4        Back   2    3    4    Next