Energoprojekt Industrija a.d.
PHARMACEUTICAL INDUSTRY

NUMBER OF SELECTED REFERENCES: 17

Page 2 od 4        Back   1    2    3    Next
PROJECT:
Preparation of design documents, provision of consultancy services and implementation of works for building Factory of flonivine BS capacity of 4.500 m2/60.000 capsules/h, within “ICN Montenegro“, Podgorica.
INVESTOR:
“ICN MONTENEGRO“, Podgorica
COUNTRY:
Montenegro
PROJECT:
Preparation of design documents and provision of consultancy services for building Galen form plant 70 t/year X-ray film plant 20 t/year High rack storage 6.000 palettes within the complex “ZORKA PHARMA“ Šabac.
INVESTOR:
“ZORKA PHARMA”, Šabac
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Factory of medicines “ICN Polyfarm“ Čeljabinsk, capacity of 120 mil/year tablets.
INVESTOR:
“ICN POLYFARM“, Čeljabinsk
COUNTRY:
Russia
PROJECT:
Preparation of conceptual design and design documents for building: Plant of solid galen forms and fats 120 mil. pcs/year II stage of increased production Tablet dept. – sanitation of climatization system; Central measuring facility – distribution of purified water system; Facility refurbishment 03 – Ubrazon Microbiological laboratory.
INVESTOR:
"JUGOREMEDIJA", Zrenjanin
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Factory of medicines and vaccinations in ampules, capacity of 18.000 ampules of medicines/h and 12.000 ampules of vaccinations/h, within the complex “Virion“ Tomsk.
INVESTOR:
FGUP NPO “VIRION“; Tomsk
COUNTRY:
Russia
Page 2 od 4        Back   1    2    3    Next