PROJECT:
Preparation of design documentation, Basic Design of Boiler – Power Plant within Umka Cardboard Mill including boiler facility covering the area of 850 m², chemical water preparation facility, smoke gas de-dusting and desulphurising system with a flue gas stack, ash and slag storage and coal storage plateau covering the area of 1,850 m². The facility with the installed capacity of 40/50 t/h, pressure of 36 bar, power of 40 MW (fuel: coal) is envisaged for power and gas production.
INVESTOR:
UMKA d.o.o. Cardboard Mill, Belgrade
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Heating Plant "Mladenovac", Mladenovac, Yugoslavia; 2x50 t/h steam and 75 MW.
INVESTOR:
Public Utility Company “BEOGRADSKE ELEKTRANE“, Belgrade
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for Power Plant and III Phase "Viskoza", Loznica; and Phase 240 t/h, steam and 30 MW, III phase 30 t/h steam and 25 MW.
INVESTOR:
“VISKOZA", Loznica
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for extension of Power Plant "Natron", Maglaj, Bosnia and Herzegovina 195 t/h steam and 25 MW.
INVESTOR:
“NATRON", Maglaj
COUNTRY:
Bosnia and Hercegovina
PROJECT:
Preparation of design documents for extension of Power Plant HI "Milan Blagojević", Lučani; 50/64 t/h steam and 5,5 MW.
INVESTOR:
HI “MILAN BLAGOJEVIĆ“, Lučani
COUNTRY:
Serbia