Energoprojekt Industrija a.d.
INDUSTRY OF PROCESSING ORE, METAL
AND TRANSPORTATION SYSTEMS

NUMBER OF SELECTED REFERENCES: 34

Page 1 od 7        1    2    Next
PROJECT:
Project for Technical Renovation of HBIS GROUP Serbia Iron&Steel Ltd. Belgrade - branch Smederevo; Compliance of the documentation with the local regulations, consulting and supervision; Blast furnace Gasholder 200.000 m³, Walking Beam Heating 250 t/h, Sintering Machine 1.782 mil t/g
INVESTOR:
HBIS GROUP Serbia Iron&Steel /TSIC – China
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for refurbishment of Old copper filtration, Bor, three lines per 4.000 t/year.
INVESTOR:
“RTB BOR“, Bor
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for refurbishment of the plant for Old copper flotation, three lines per 4.000 t/day, Bor.
INVESTOR:
“RTB BOR“, Bor
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for smelting plant, RTB Mine-smelting basin, Bor; 12.000 t/day ore.
INVESTOR:
“RTB BOR“, Bor
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for Goldsmith, RTB Mine-smelting basin, Bor.
INVESTOR:
“RTB BOR“, Bor
COUNTRY:
Serbia
Page 1 od 7        1    2    Next