Page 1 od 2 1 2 NextPROJECT:
Preparation of Detail Design Documentation and Data Sheets for Equipment for the construction of two units for return cooling water supply (2x4500 m³/h i 1x1000 m³/h) within Phase III of reconstruction of Oil Refinery in Atyrau, Kazakhstan.
Preparation of Detail Design Documentation and Data Sheets for Equipment for the construction of two units for return cooling water supply (2x4500 m³/h i 1x1000 m³/h) within Phase III of reconstruction of Oil Refinery in Atyrau, Kazakhstan.
INVESTOR:
AMPZ (Atirau Oil Rafinery), Kazakhstan
AMPZ (Atirau Oil Rafinery), Kazakhstan
COUNTRY:
Kazakhstan
Kazakhstan
PROJECT:
Preparation of Detail Design Documentation and Data Sheets for Equipment for 4 compressor stations (out of 8 in total) with the respective capacities of 3 x 30 MW (2 in duty, one stand by), 9,81MPa of working pressure within the Project of “Increasing Capacity of Main Gas Pipeline Kazakhstan – China” on C line (0-645 km), emplaced from the Uzbekistan border and in parallel with the existing A and B lines. CS-1, CS-3, CS-5, CS-7 with the total transport capacity of 18.7+6.3 billion m3/year.
Preparation of Detail Design Documentation and Data Sheets for Equipment for 4 compressor stations (out of 8 in total) with the respective capacities of 3 x 30 MW (2 in duty, one stand by), 9,81MPa of working pressure within the Project of “Increasing Capacity of Main Gas Pipeline Kazakhstan – China” on C line (0-645 km), emplaced from the Uzbekistan border and in parallel with the existing A and B lines. CS-1, CS-3, CS-5, CS-7 with the total transport capacity of 18.7+6.3 billion m3/year.
INVESTOR:
Asia gas pipeline AGP, Kazakhstan
Asia gas pipeline AGP, Kazakhstan
COUNTRY:
Kazakhstan
Kazakhstan
PROJECT:
Performance of works with delivery of equipment for Petrol stations in cities, Samarkand, Buhara and Navoja with 5 automatic loaders each.
Performance of works with delivery of equipment for Petrol stations in cities, Samarkand, Buhara and Navoja with 5 automatic loaders each.
INVESTOR:
“MINISTRY OF TOURISM OF THE REPUBLIC OF UZBEKISTAN“
“MINISTRY OF TOURISM OF THE REPUBLIC OF UZBEKISTAN“
COUNTRY:
Uzbekistan
Uzbekistan
PROJECT:
Preparation of General design and previous feasibility study of productlines through Serbia, including 6 terminals with petrol tanks and auxiliary facilities and plants, mutually connected by productlines The terminals include: * Tanks for vehicle petrol 4 x 5.000 m3 * Tank for diesel fuel 4 x 5.000 m3
Preparation of General design and previous feasibility study of productlines through Serbia, including 6 terminals with petrol tanks and auxiliary facilities and plants, mutually connected by productlines The terminals include: * Tanks for vehicle petrol 4 x 5.000 m3 * Tank for diesel fuel 4 x 5.000 m3
INVESTOR:
“TRANSNAFTA“, Belgrade
“TRANSNAFTA“, Belgrade
COUNTRY:
Serbia
Serbia
PROJECT:
Provision of consalting services and supervision over contracting and Business facility 5.500 m2 Reconstruction of 5 petrol stations (city and highway) Oil derivate storages in Jagodina, tank volume of 12.000 m3 Oil derivate storage in Bogutovac, tank volume 2.000 m.
Provision of consalting services and supervision over contracting and Business facility 5.500 m2 Reconstruction of 5 petrol stations (city and highway) Oil derivate storages in Jagodina, tank volume of 12.000 m3 Oil derivate storage in Bogutovac, tank volume 2.000 m.
INVESTOR:
“LUKOIL-BEOPETROL“, Belgrade
“LUKOIL-BEOPETROL“, Belgrade
COUNTRY:
Serbia
Serbia