Energoprojekt Industrija a.d.
METAL PROCESSING INDUSTRY

NUMBER OF SELECTED REFERENCES: 8

Page 1 od 2        1    2    Next
PROJECT:
Preparation of complete technical documentation and provision of consulting services for reconstruction, adaptation, rehabilitation and construction of facilities within the Complex for Production of Ship Winches, RAPP Zastava Winches d.o.o., Gruža. The total useful area covered by these structures is 9.500 m².
INVESTOR:
RAPP ZASTAVA WINCHES d.o.o. Gruža (RAPP MARINE GROUP)
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Factory of agricultural machines "Zmaj", Zemun capacity of 40.000 pcs/y. agricultural machines (tractors, harvesters, etc.).
INVESTOR:
"ZMAJ", Zemun
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Factory for fittings "Krušik", Valjevo, capacity of 170.000 pcs/y. sanitary fittings.
INVESTOR:
"KRUŠIK", Valjevo
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Central workshop "Beogradske elektrane" , Novi Belgrade; surface of 7.000 m2.
INVESTOR:
"BELGRADESKE ELEKTRANE", New Belgrade
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Plant for metal barrel treatment, "NIS-FAM", Kruševac; barrels 200 lit.
INVESTOR:
"NIS-FAM", Kruševac
COUNTRY:
Serbia
Page 1 od 2        1    2    Next