Energoprojekt Industrija a.d.
AIRPORTS

NUMBER OF SELECTED REFERENCES: 16

Page 1 od 4        1    2    Next
PROJECT:
Development of technical documentation for Refurbishment and extension of facilities within Nikola Tesla Airport in two phases by 2025 – Terminal Building I and auxiliary buildings: Terminal building – Refurbishment and extension by 2020: 41.200 m²; Planned extension by 2025: 28.000 m²; Gas-fired hot-water heating plant, 2x16.2 MW + 10 MW; Wastewater treatment plant: 855 m³/day; Solid waste processing plant
INVESTOR:
VINCI AIRPORTS SERBIA
COUNTRY:
Serbia
PROJECT:
Smoking cabin; turn-key – Capacity cca 20 people; Independent ventilation system with 100% fresh air intake; Injection flow rate 2000m3/h, and extraction flow rate 2200 m3/h
INVESTOR:
NIKOLA TESLA AIRPORT A.D. BELGRADE
COUNTRY:
Serbia
PROJECT:
The execution of works on improving the security of passport control gates; 14 pieces of slide doors at T1 and T2 and relocation of the passport reader devices
INVESTOR:
NIKOLA TESLA AIRPORT A.D. BELGRADE
COUNTRY:
Serbia
PROJECT:
Development of the survey report and design for construction for 11 buildings within the Nikola Tesla Airport - 5 civil engineering construction and 6 building construction
INVESTOR:
NIKOLA TESLA AIRPORT A.D. BELGRADE
COUNTRY:
Serbia
PROJECT:
Development of the design documentation for Adaptation of part of Terminal 2 within Nikola Tesla Airport in Belgrade – High class Commercial area
INVESTOR:
NIKOLA TESLA AIRPORT A.D. BELGRADE
COUNTRY:
Serbia
Page 1 od 4        1    2    Next