References
INDUSTRY OF PROCESSING ORE, METAL
AND TRANSPORTATION SYSTEMS
AND TRANSPORTATION SYSTEMS
NUMBER OF SELECTED REFERENCES: 34
Page 2 od 7 Back 1 2 3 NextPROJECT:
Preparation of design documents for the main conveyor system of ore "FENI", Kavadarci, Macedonia; 8 conveyors, total length 38 km capacity 550 t/h ore, height difference 400 m.
Preparation of design documents for the main conveyor system of ore "FENI", Kavadarci, Macedonia; 8 conveyors, total length 38 km capacity 550 t/h ore, height difference 400 m.
INVESTOR:
"FENI", Kavadarci
"FENI", Kavadarci
COUNTRY:
FYR Macedonia
FYR Macedonia
PROJECT:
Preparation of design documents for Smelting Complex "Feronikl", Glogovac, 12.000 t/year nickel.
Preparation of design documents for Smelting Complex "Feronikl", Glogovac, 12.000 t/year nickel.
INVESTOR:
"FERONIKL", Glogovac
"FERONIKL", Glogovac
COUNTRY:
Serbia
Serbia
PROJECT:
Preparation of design documents for Cast plant "Crvena Zastava", Kragujevac, 50.000 t/year steel moulds.
Preparation of design documents for Cast plant "Crvena Zastava", Kragujevac, 50.000 t/year steel moulds.
INVESTOR:
"CRVENA ZASTAVA", Kragujevac
"CRVENA ZASTAVA", Kragujevac
COUNTRY:
Serbia
Serbia
PROJECT:
Preparation of design documents for the plant "Ivo Lola Ribar", Železnik, 6.000 m2 production hall and 2600 m2 assembly hall.
Preparation of design documents for the plant "Ivo Lola Ribar", Železnik, 6.000 m2 production hall and 2600 m2 assembly hall.
INVESTOR:
"IVO LOLA RIBAR", Železnik
"IVO LOLA RIBAR", Železnik
COUNTRY:
Serbia
Serbia
PROJECT:
Preparation of design documents for milling plant and basic flotation, Copper mine 2000 t/h, Majdanpek.
Preparation of design documents for milling plant and basic flotation, Copper mine 2000 t/h, Majdanpek.
INVESTOR:
“RTB BOR“, Bor
“RTB BOR“, Bor
COUNTRY:
Serbia
Serbia