Energoprojekt Industrija a.d.
INDUSTRY OF PROCESSING ORE, METAL
AND TRANSPORTATION SYSTEMS

NUMBER OF SELECTED REFERENCES: 34

Page 2 od 7        Back   1    2    3    Next
PROJECT:
Preparation of design documents for the main conveyor system of ore "FENI", Kavadarci, Macedonia; 8 conveyors, total length 38 km capacity 550 t/h ore, height difference 400 m.
INVESTOR:
"FENI", Kavadarci
COUNTRY:
FYR Macedonia
PROJECT:
Preparation of design documents for Smelting Complex "Feronikl", Glogovac, 12.000 t/year nickel.
INVESTOR:
"FERONIKL", Glogovac
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for Cast plant "Crvena Zastava", Kragujevac, 50.000 t/year steel moulds.
INVESTOR:
"CRVENA ZASTAVA", Kragujevac
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for the plant "Ivo Lola Ribar", Železnik, 6.000 m2 production hall and 2600 m2 assembly hall.
INVESTOR:
"IVO LOLA RIBAR", Železnik
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for milling plant and basic flotation, Copper mine 2000 t/h, Majdanpek.
INVESTOR:
“RTB BOR“, Bor
COUNTRY:
Serbia