References
TRANSPORTATION AND STORAGE OF OIL AND GAS
NUMBER OF SELECTED REFERENCES: 8
Page 1 od 2 1 2 NextPROJECT:
Delayed coking unit (DCU) within the Oil refinery NIS; Compliance of the documentation with the local rules and regulation, development of static calculations for concrete and steel structures; development of all designs for auxiliary buildings; consulting services; review and certification of the design for pressurized pipeline.
Delayed coking unit (DCU) within the Oil refinery NIS; Compliance of the documentation with the local rules and regulation, development of static calculations for concrete and steel structures; development of all designs for auxiliary buildings; consulting services; review and certification of the design for pressurized pipeline.
INVESTOR:
CB&I and NIS a.d. Oil Refinery Pančevo
CB&I and NIS a.d. Oil Refinery Pančevo
COUNTRY:
Serbia
Serbia
PROJECT:
Simplified mining design for construction of Container pump units’ installation on the Kikinda Polje, Mokrin Jug and Jermenovci manufacturing facilities
Simplified mining design for construction of Container pump units’ installation on the Kikinda Polje, Mokrin Jug and Jermenovci manufacturing facilities
INVESTOR:
NIS a.d.
NIS a.d.
COUNTRY:
Serbia
Serbia
PROJECT:
Preparation of Detail Design Documentation and Data Sheets for Equipment for the construction of two units for return cooling water supply (2x4500 m³/h i 1x1000 m³/h) within Phase III of reconstruction of Oil Refinery in Atyrau, Kazakhstan.
Preparation of Detail Design Documentation and Data Sheets for Equipment for the construction of two units for return cooling water supply (2x4500 m³/h i 1x1000 m³/h) within Phase III of reconstruction of Oil Refinery in Atyrau, Kazakhstan.
INVESTOR:
AMPZ (Atirau Oil Rafinery), Kazakhstan
AMPZ (Atirau Oil Rafinery), Kazakhstan
COUNTRY:
Kazakhstan
Kazakhstan
PROJECT:
Preparation of Detail Design Documentation and Data Sheets for Equipment for 4 compressor stations (out of 8 in total) with the respective capacities of 3 x 30 MW (2 in duty, one stand by), 9,81MPa of working pressure within the Project of “Increasing Capacity of Main Gas Pipeline Kazakhstan – China” on C line (0-645 km), emplaced from the Uzbekistan border and in parallel with the existing A and B lines. CS-1, CS-3, CS-5, CS-7 with the total transport capacity of 18.7+6.3 billion m3/year.
Preparation of Detail Design Documentation and Data Sheets for Equipment for 4 compressor stations (out of 8 in total) with the respective capacities of 3 x 30 MW (2 in duty, one stand by), 9,81MPa of working pressure within the Project of “Increasing Capacity of Main Gas Pipeline Kazakhstan – China” on C line (0-645 km), emplaced from the Uzbekistan border and in parallel with the existing A and B lines. CS-1, CS-3, CS-5, CS-7 with the total transport capacity of 18.7+6.3 billion m3/year.
INVESTOR:
Asia gas pipeline AGP, Kazakhstan
Asia gas pipeline AGP, Kazakhstan
COUNTRY:
Kazakhstan
Kazakhstan
PROJECT:
Performance of works with delivery of equipment for Petrol stations in cities, Samarkand, Buhara and Navoja with 5 automatic loaders each.
Performance of works with delivery of equipment for Petrol stations in cities, Samarkand, Buhara and Navoja with 5 automatic loaders each.
INVESTOR:
“MINISTRY OF TOURISM OF THE REPUBLIC OF UZBEKISTAN“
“MINISTRY OF TOURISM OF THE REPUBLIC OF UZBEKISTAN“
COUNTRY:
Uzbekistan
Uzbekistan