Energoprojekt Industrija a.d.
TRANSPORTATION AND STORAGE OF OIL AND GAS

NUMBER OF SELECTED REFERENCES: 8

Page 1 od 2        1    2    Next
PROJECT:
Delayed coking unit (DCU) within the Oil refinery NIS; Compliance of the documentation with the local rules and regulation, development of static calculations for concrete and steel structures; development of all designs for auxiliary buildings; consulting services; review and certification of the design for pressurized pipeline.
INVESTOR:
CB&I and NIS a.d. Oil Refinery Pančevo
COUNTRY:
Serbia
PROJECT:
Simplified mining design for construction of Container pump units’ installation on the Kikinda Polje, Mokrin Jug and Jermenovci manufacturing facilities
INVESTOR:
NIS a.d.
COUNTRY:
Serbia
PROJECT:
Preparation of Detail Design Documentation and Data Sheets for Equipment for the construction of two units for return cooling water supply (2x4500 m³/h i 1x1000 m³/h) within Phase III of reconstruction of Oil Refinery in Atyrau, Kazakhstan.
INVESTOR:
AMPZ (Atirau Oil Rafinery), Kazakhstan
COUNTRY:
Kazakhstan
PROJECT:
Preparation of Detail Design Documentation and Data Sheets for Equipment for 4 compressor stations (out of 8 in total) with the respective capacities of 3 x 30 MW (2 in duty, one stand by), 9,81MPa of working pressure within the Project of “Increasing Capacity of Main Gas Pipeline Kazakhstan – China” on C line (0-645 km), emplaced from the Uzbekistan border and in parallel with the existing A and B lines. CS-1, CS-3, CS-5, CS-7 with the total transport capacity of 18.7+6.3 billion m3/year.
INVESTOR:
Asia gas pipeline AGP, Kazakhstan
COUNTRY:
Kazakhstan
PROJECT:
Performance of works with delivery of equipment for Petrol stations in cities, Samarkand, Buhara and Navoja with 5 automatic loaders each.
INVESTOR:
“MINISTRY OF TOURISM OF THE REPUBLIC OF UZBEKISTAN“
COUNTRY:
Uzbekistan