Energoprojekt Industrija a.d.
FOOD INDUSTRY

NUMBER OF SELECTED REFERENCES: 25

Page 2 od 5        Back   1    2    3    Next
PROJECT:
Preparation of design documents for building Mineral water bottling plant “Vrnjci”, existing plant, in Vrnjacka Banja, capacity of 12.000 1 l bottle/h.
INVESTOR:
Mineral water bottling plant “VRNJCI“, Vrnjačka Banja
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building Mineral water bottling plant “Heba”, Bujanovac, Phase I, 12.000 1-l bottle/h Phase II 14.000 1-l bottle and 10000 pcs/h PET bottle of 1,5 lit.
INVESTOR:
“HEBA”, Serbia
COUNTRY:
Serbia
PROJECT:
Preparation of design documents for building of Slaughterhouse and Cold storage in Krasnokutsk capacity of 30 cattle/shift, 150 sheep/shift, 10 pigs/shift Zrnokompleks: Wheat grinder plant 150 t/day Factory of animal food 60 tons/shift Factory of pastry 12 tons/shift. Wheat silo 6.600 tons Wool processing 1500 ton/year Dairies 30 ton/shift
INVESTOR:
“PAVLODARSK DISTRICT“ Krasnokutsk
COUNTRY:
Kazakhstan
PROJECT:
Preparation of design documents and implementation of works at building of Factory of chocolate and chocolate products, “Banat” Vrsac, capacity of 4.200 t/year.
INVESTOR:
“BANAT”, Vrsac
COUNTRY:
Serbia
PROJECT:
Design of development and difersification of operations (brainstorming, market survey, data collection on equipment, preparation of preliminary design and feasibility study, finding the partner for investment of required assets, design, consulting, engineering and managing the entire production, placement as well as all phases of increase of scope of production and assortment of PET-forms for realization of factory of PET forms in Krnješevci, capacity of 6 lines - 650.000.000 pcs/year.
INVESTOR:
“ENERGOPET“, Krnješevci
COUNTRY:
Serbia
Page 2 od 5        Back   1    2    3    Next