References
GAS DISTRIBUTION
NUMBER OF SELECTED REFERENCES: 11
Page 2 od 3 Back 1 2 3 NextPROJECT:
Preparation of design documents for Distribution network of natural gas within the complex and facility, APK "Kubanj", Timoševsk; P=4bar, 20.000 Nm3/h.
Preparation of design documents for Distribution network of natural gas within the complex and facility, APK "Kubanj", Timoševsk; P=4bar, 20.000 Nm3/h.
INVESTOR:
APK “KUBANJ“, Timoševsk
APK “KUBANJ“, Timoševsk
COUNTRY:
Russia
Russia
PROJECT:
Preparation of design documents for Metering reducing station and distribution to consumers of natural gas "Bioferm", Žitište, P = 9/2 bar, 3.000 Nm3/h.
Preparation of design documents for Metering reducing station and distribution to consumers of natural gas "Bioferm", Žitište, P = 9/2 bar, 3.000 Nm3/h.
INVESTOR:
“BIOFERM", Žitište
“BIOFERM", Žitište
COUNTRY:
Serbia
Serbia
PROJECT:
Preparation of design documents for Extension of coal gasification, "Kosovo", Obilić; P=20 bar 70.000 Nm3/h.
Preparation of design documents for Extension of coal gasification, "Kosovo", Obilić; P=20 bar 70.000 Nm3/h.
INVESTOR:
EPS-JP PK “KOSOVO“, Obilić
EPS-JP PK “KOSOVO“, Obilić
COUNTRY:
Serbia
Serbia
PROJECT:
Preparation of design documents for Connection to gas TETO "Novi Belgrade", TO "Dunav", TO "Voždovac", "Belgrade power stations" Belgrade.
Preparation of design documents for Connection to gas TETO "Novi Belgrade", TO "Dunav", TO "Voždovac", "Belgrade power stations" Belgrade.
INVESTOR:
Public Utility Company “BEOGRADSKE ELEKTRANE“, Belgrade
Public Utility Company “BEOGRADSKE ELEKTRANE“, Belgrade
COUNTRY:
Serbia
Serbia
PROJECT:
Preparation of design documents for Distribution of natural gas to the consumers, Factory "Česma", Bjelovar, Croatia; P=6/3 bar.
Preparation of design documents for Distribution of natural gas to the consumers, Factory "Česma", Bjelovar, Croatia; P=6/3 bar.
INVESTOR:
“ČESMA", Bjelovar
“ČESMA", Bjelovar
COUNTRY:
Croatia
Croatia