| Smelting
Plants and Foundries |
|
|
| |
|
"Feronikl",
Glogovac
smelting works, 12.000 t nickel/year |
|
|
|
|
Copper Mine Majdanpek
Grinding and Basic Flotation Plant 2.000
t/h
Plant for Extraction of Precious Metals from flotation
gangue, 28.000 ton/year of concentrate.
Pyrite Flotation Plant , flotation plant, transport of
pulp for 3 km, building 1.200 m2, with conveyor belts
Molibdene Flotation Plan
Pilot Plant for Copper Flotation |
|
| |
|
Mining
and Smelting Works BOR
reconstruction of copper flotation, three lines each of
4.000 ton/year |
|
| |
|
Mining
and Smelting Works BOR
smelting plant, 12.000 ton/day ore gold |
|
Carborundum
Factory, Surdulica, 2.000 ton/year
|
|
"Crvena
Zastava", Kragujevac, foundry 50.000 ton/year steel
castings
|
|
| |
|
Tennessee,
USA
Conveyor and Screen Tower |
|
| |
|
| "FENI",
Kavadarci, Macedonia |
|
| |
|
"FENI",
Kavadarci, Macedonia
Main Ore Transportation System; 8 conveyor belts, total
length 38 km, capacity 550 t/h, 400 m difference of
levels |
|
|
|
|
|
|
Mining and Smelting Works Bor, conveyor system for underground
mining
15-17 galleries, 1.800 t/h, length 550 m, difference
of levels 100 m.
|
|
| |
|
| |
Conveyor
system, crushing plants "Veliki Krivelj",
transport 4.700 t/h, length 3,0 km, level difference 188
m and crushing plants 2 X 2.500 t/h
hydraulic transport system Cerovo-Bor, 640 m3/h ore slurry,
13,5 km |
|
"Kosovo",
Obilic, coal transportation system of length 600 m, drier
|
|
"Zorka",
Sabac, transportation and storage of zinc concentrate
and pyrite burns, area 3.200 m2
|
|
Copper
Mine, Majdanpek
conveyor system with crushing plant "Severni revir
2",
transport 2.000 t/h, length 2,5 km, difference of levels
170 m, crushing plant 1 x 2.500 t/h
conveyor system with crushing plant "Severni revir
4",
transport 2.000 t/h, length 1,5 km, difference of levels
80 m, crushing plant 1 x 3.000 t/h
|
|
Junction
city, USA
Conveyor and Screen Tower
|
|
|